The RIBA Plan of Work 2013 is an eight-stage building design and construction process for UK professionals.
Building’s fifth annual BIM survey shows that the number of companies taking advantage of BIM is growing. With the number of BIM design tools also on the rise, which of these are leading the way in improving the feasibility study process?